Skip to content

Adds Ruff + makes corresponding fixes #339

Adds Ruff + makes corresponding fixes

Adds Ruff + makes corresponding fixes #339

Triggered via pull request November 22, 2024 17:23
Status Failure
Total duration 36s
Artifacts

e2e.yaml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.11)
Process completed with exit code 4.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.
build (3.12)
The job was canceled because "_3_11" failed.
build (3.12)
Process completed with exit code 4.