Skip to content

Bump peter-evans/create-pull-request from 6.0.0 to 6.1.0 #2

Bump peter-evans/create-pull-request from 6.0.0 to 6.1.0

Bump peter-evans/create-pull-request from 6.0.0 to 6.1.0 #2

Status Failure
Total duration 2m 40s
Artifacts

tests.yml

on: push
Matrix: tests
coverage
0s
coverage
Fit to window
Zoom out
Zoom in

Annotations

16 errors
Ubuntu / 3.10
Process completed with exit code 1.
Windows / 3.11
The job was canceled because "Ubuntu_3_10" failed.
Windows / 3.12
The job was canceled because "Ubuntu_3_10" failed.
Ubuntu / 3.9
The job was canceled because "Ubuntu_3_10" failed.
Windows / 3.10
The job was canceled because "Ubuntu_3_10" failed.
Windows / 3.9
The job was canceled because "Ubuntu_3_10" failed.
MacOS / 3.10
The job was canceled because "Ubuntu_3_10" failed.
MacOS / 3.10
Process completed with exit code 1.
MacOS / 3.9
The job was canceled because "Ubuntu_3_10" failed.
MacOS / 3.9
A task was canceled.
Ubuntu / 3.12
The job was canceled because "Ubuntu_3_10" failed.
MacOS / 3.12
The job was canceled because "Ubuntu_3_10" failed.
MacOS / 3.11
The job was canceled because "Ubuntu_3_10" failed.
MacOS / 3.11
The operation was canceled.
Ubuntu / 3.11
The job was canceled because "Ubuntu_3_10" failed.
Ubuntu / 3.11
The operation was canceled.